Engineering Department

Town Planning Department

Pre Operations

Engineering Department

New Water Supply Connection (Temporary)

This service is required after plot allotment for construction of building.

New Drainage connection

This service is required to connect the drainage line from plot to the effluent collection system of MIDC.

No Dues Certificate for water

This No Dues certificate is required for any service to be applied. It is only for inter departmental use. It is issued by respective water bill issuing authority. It certifies that the plot holder is not holding any outstanding water, fire and services charges dues with the MIDC. (This certificate should not be used outside MIDC).
The No Dues Certificate shall be issued within 7 days of the date of application submission on SWC.The No Dues Certificate shall be issued within 7 days of the date of application submission on SWC.
No charges are applicable.
The No Dues Certificate will remain valid till issuance of next month’s Water Bill.

No Objection Certificate Power connection

This service is required for Grant of power connection of required kwh. for Plot No. in Industrial Area.

Water Bill Consumer Portal

You can now view Water bill, Service charge Bill and GramPanchayat Property Tax receipts on consumer portal. Please register with your mobile number , email and avail the benefits of easy to use bill and receipt views. You can also have many more facilities like past bill receipts and transaction history.

Head Office

"Udyog Sarathi”,Marol Indl. Area,
Mahakali Caves Road,Andheri (East),
Mumbai – 400 093.
Tel: 022-47488312/47484699/47484679
GST No: 27AAACM3560C1ZV

Find Us On

Copyright © All Rights Reserved.